Monza’s hospital gains innew surface area and extends its expected lifespan with the renovation of the existing areas.
Phase after phase, intelligent building approaches have been expertly applied in the existing context, seeking to respect the time scheduling and flows of health care activities. When building wellbeing, it’s essential to limit noise, dust and other disturbances for patients and staff.
THE HOSPITAL BUILDING SITE
Allowing the building site activities to proceed at the same time as the health care activities: a challenge won by CMB, which limited its impact and interferences
The project for the redevelopment of the San Gerardo Hospital in Monza was aimed at adapting the structure to significant organisational, health care and technological changes which have been modifying patient care procedures over the last few years. To this end, the new hospital complex has been subdivided into different autonomous buildings, but connected between them, able to accommodate and manage different health care activities while reducing interferences.
The first phase of the works, completed in spring 2015, involved the complete renovation of the hospital monoblock and the existing forepart, besides the structure called “Tenaglia”, with the development of two-bed patient rooms with bathroom, improvements in the route-ways, also vertical (lifts), adjustment to the latest safety standards regarding earthquake and fire measures, and the renovation of the facades with an improvement in climate performance.
The work then progressed onto phase 2, which involved the renovation of the sector B monoblock, including preparatory work for the continued operation of health care activities, work on sectors A and C, following by another two phases that will see the renovation of sector C and sector A.
Developed according to the Concession with project financing formula, the project included the design, construction and management of the services. The concession provides for the management of important supply and maintenance services: staff canteen, catering for the patients, laundry, waste management, cleaning and porter service, building maintenance, heating system and its management.
Dottor Mario Alparone
General Director of Monza Local Healthcare Area.
The building site moves on to the central sector of the 11-floor monoblock, a place of great health care activity. The work follows a precise time schedule, so as to make the intervention compatible with the continuation of the healthcare service.
The first phase is completed: the New Forepart, called “Palazzina Accoglienza” (Reception Building) is ready to accommodate outpatient rooms and day hospitals. The Tenaglia pavilion and the Existing Forepart have also been renovated.
Starting with the construction of a building in front of the previous “New Forepart” structure and the renovation of the building called Existing Forepart. The work aims for a radical modernization and redevelopment of the hospital.
Definitive award of the concession contract for the construction and renovation of the San Gerardo Hospital in Monza on account of the commissioning body, Infrastrutture Lombarde Spa
P.IVA 00154410369
Registro delle Società di Modena
n. 00154410369 – C.C.I.A.A. 2698
Albo Cooperative n. A100255
©2018 CMB
Cooperativa Muratori e Braccianti di Carpi
Tutti i diritti riservati / All rights reserved
CONTACTS
Sede Centrale
via C. Marx 101 Carpi (MO) – ITALY
Ph +39 059 6322111
Fax +39 059 691079