CMB Carpi Logo Retina
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
    • Becoming Suppliers
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Spontaneous Application
    • Internship
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • IT
  • EN
Menu
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
    • Becoming Suppliers
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Spontaneous Application
    • Internship
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • IT
  • EN
  • it
  • en
04/03/2019

Porta Nuova Varesine

Milan
ITALY

Managing innovations in a complex project:

CMB’s strategy at Porta Nuova Varesine, Milan

Porta Nuova Varesine is the largest redevelopment project ever carried out in the city of Milan.

For this reason CMB has used various innovative approaches and techniques, but most of all, has shown a great capacity for coordination.

A careful initial analysis, aimed at optimising performances and construction costs, has led to technologically innovative construction choices, such as:

•The Peri RCS Formwork System that slides inside grooves and which can be lifted with a crane
•The ACS Self-Climbing Crane incorporated inside the nucleus for the handling of the formworks, which carried out almost all the operations necessary for the construction of the load-bearing nucleus in reinforced concrete almost autonomously
•The Concrete feeding system at height through a pump with a stationary ACS Self-Climbing Arm incorporated inside the nucleus
•The use of an external crane, anchored to the steel columns, used almost exclusively for the handling of metallic carpentry (pillars, beams and corrugated sheets) and subsequently for installing the façade cells.

The coordination of this work was complex, especially due to interferences between the teams responsible for the assembly of the metallic structure and those involved in the concrete works. Secondly, heavy vehicles were always present in the site, used for transporting the metallic elements and cement mixers for the casting of concrete structures, which moved around, affecting the local traffic conditions.

Back to the Project
Back to top
Share this page
Share this page
Back to top
CMB Carpi Logo

P.IVA 00154410369
Registro delle Società di Modena
n. 00154410369 – C.C.I.A.A. 2698
Albo Cooperative n. A100255

©2018 CMB
Cooperativa Muratori e Braccianti di Carpi
Tutti i diritti riservati / All rights reserved

PROJECTS

FACILITY MANAGEMENT

PEOPLE

SAFETY

INNOVATION

COMPANY
What we do
Values
Enterprise’s History
Governance
Results
Commitment
Certifications
Becoming Supplier

LAVORA CON NOI

MEDIA
News
Video
House Organ
Press Release
Press Kit

SOCIAL NETWORK
Linkedin
Youtube

CONTACTS
Sede Centrale
via C. Marx 101 Carpi (MO) – ITALY
Ph +39 059 6322111
Fax +39 059 691079

Privacy Policy
Cookie Policy
Credits