CMB Carpi Logo Retina
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
    • Becoming Suppliers
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Spontaneous Application
    • Internship
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • EN
  • IT
Menu
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
    • Becoming Suppliers
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Spontaneous Application
    • Internship
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • EN
  • IT
  • it
  • en
04/12/2020

Hospital and Health City

PORDENONE
ITALY

The hospital as a place of health and sustainability

The new Pordenone hospital is a structure designed for energy saving,

and CMB has employed all of its skills to maximize the result. Led lamps, photovoltaic and tri-generation systems, which make it possible to use recovered energy for the joint production of electricity, heat and cooling power, make the structure a green project. With regards to the sustainability of the work, the spaces and layout have been optimized and principles of material durability and ease of maintenance and sanitization have been adopted.

A HEART STRENGTHENED BY STEEL
The structure of the Pordenone hospital is anti-seismic: the site manager Carmine Lombardi describes the metal reinforcement.

cmb-pordenone-hospital-gallery-2
cmb-pordenone-hospital-gallery-3
cmb-pordenone-hospital-gallery-4
cmb-pordenone-hospital-gallery-5
cmb-pordenone-hospital-gallery-7
cmb-pordenone-hospital-gallery-6
3
photovoltaic systems
1
tri-generation system
392
car park spaces
Technical Description

The area on which the new hospital will stand overlaps slightly with the existing health facility, to which the grounds of the “Former Caserma Martelli” will also be attached. The main structure will be composed of a nucleus of four main bodies connected by a cross-linking body. The lower levels will have a “plate” configuration, and will be used for reception of the general public and the housing of high technology services. The four “towers”, each five floors above ground at the highest point, will house the wards and inpatient functions. The outpatient functions, both of an emergency and of an ordinary nature, shall instead be positioned in the connecting body, which will be in two levels.
 
The “Citadel of Health”, providing dedicated outpatient services to the community, will be located at the opposite extreme of the lot and will be arranged in two regular-shaped buildings, of a maximum height of four floors above ground. A large underground car park serving users and health workers will also be built. The sustainability of the work has been a key aspect of the design.

The value of safety

The building site for constructing the car park has won a gold medal for zero injuries.

A hospital at Pordenone which combines efficiency and energy savings

The numbers for the hospital: its construction, equipped areas, sources and consumption of energy and technical features.

Timeline

November 2018

Lessons in the building site

Pordenone Hospital is already the subject of study. Students in Bologna University’s Engineering Faculty and students in the fifth year of the city’s “Sandro Pertini” Technical High School made a visit to the building site. CMB’s engineers and surveyors were there to welcome them.

January 2018

Cutting the ribbon for the hospital car park

The car park next to the future Pordenone hospital was formally opened on 31 January 2018. The work began on 27 April 2017. The street level car park has an underground floor reserved for employees with a total of 392 spaces, eight of which are for disabled people.

October 2016

The signing of the contract with CMB as project leader

The contract with the Ati (temporary consortium of contractors), with CMB as project leader, was signed on 4 October in the presence of the director general of Aas 5, Giorgio Simon, and the president of the Friuli Venezia Giulia Region, Debora Serracchiani. CMB, in partnership with the enterprise Polese Spa di Sacile, will build the new Pordenone hospital for a value of around 110 million euros.

> The Odense hospital project (VIDEO)

Value of the works
110,000,000 euros
Client
Azienda per l’Assistenza Sanitaria no.5 Friuli Occidentale
Role in the project
Project leader
Completion times
March 2017 – in progress
see also

Odense Hospital Complex Odense (Denmark)

 

Niguarda Ca’ Granda Hospital Milan

2013

Borgo Roma and Borgo Trento Hospitals Verona

2017
Share this page
Share this page
Back to top
CMB Carpi Logo

P.IVA 00154410369
Registro delle Società di Modena
n. 00154410369 – C.C.I.A.A. 2698
Albo Cooperative n. A100255

©2018 CMB
Cooperativa Muratori e Braccianti di Carpi
Tutti i diritti riservati / All rights reserved

PROJECTS

FACILITY MANAGEMENT

PEOPLE

SAFETY

INNOVATION

COMPANY
What we do
Values
Enterprise’s History
Governance
Results
Commitment
Certifications
Becoming Supplier

LAVORA CON NOI

MEDIA
News
Video
House Organ
Press Release
Press Kit

SOCIAL NETWORK
Linkedin
Youtube

CONTACTS
Sede Centrale
via C. Marx 101 Carpi (MO) – ITALY
Ph +39 059 6322111
Fax +39 059 691079

Privacy Policy
Cookie Policy
Credits