CMB Carpi Logo Retina
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
    • Becoming Suppliers
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Spontaneous Application
    • Internship
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • IT
  • EN
Menu
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
    • Becoming Suppliers
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Spontaneous Application
    • Internship
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • IT
  • EN
  • it
  • en
04/12/2020

Borgo Roma and Borgo Trento Hospitals

VERONA
ITALY

Integrating new and old structures in Verona

Integrating new structures with what already exists and which continues to function is certainly not an easy task, especially if we are dealing with health facilities. The Borgo Trento and Borgo Roma hospitals in Verona are an example of how it’s possible to integrate structures of this type in an effective and practical manner. It was a building site which has shown how, with careful coordination, different branches of expertise and different entities can work together to achieve the best possible result. It was a testing ground for innovations such as BIM (Building information modeling), the technology that allows for three-dimensional supervision of the design and construction in real time.

INTEGRATE NEW AND EXISTING CONSTRUCTIONS
The project manager, Alessio Baldoni, tells about the planning and construction experience with the Borgo Roma hospital

cmb-borgo-roma-borgo-trento-hospital-gallery-1
cmb-borgo-roma-borgo-trento-hospital-gallery-2
cmb-borgo-roma-borgo-trento-hospital-gallery-3
cmb-borgo-roma-borgo-trento-hospital-gallery-4
cmb-borgo-roma-borgo-trento-hospital-gallery-5
cmb-borgo-roma-borgo-trento-hospital-gallery-6
cmb-borgo-roma-borgo-trento-hospital-gallery-7
cmb-borgo-roma-borgo-trento-hospital-gallery-9
cmb-borgo-roma-borgo-trento-hospital-gallery-10
cmb-borgo-roma-borgo-trento-hospital-gallery-11
cmb-borgo-roma-borgo-trento-hospital-gallery-12
cmb-borgo-roma-borgo-trento-hospital-gallery-13
cmb-borgo-roma-borgo-trento-hospital-gallery-14
cmb-borgo-roma-borgo-trento-hospital-gallery-15
120
the average number of workers in the building site
8
operating theatres (in the two sites)
518
beds (in the two sites)
Technical Description

Arena Sanità Spa is the Special Purpose Entity, towards which CMB currently contributes with a 34.08% stake, specially set up to perform the role of Assignee for the project. The concession agreement provided for design, construction and management for

the extension and renovation of the Borgo Roma Policlinic and the Civile Maggiore Hospital of Borgo Trento.

The project involved two new structures arising from the need to demolish and rebuild from scratch the Woman and Child Centre building at Borgo Trento and to construct a new building at Borgo Roma able to deal with day hospital activities in terms of outpatient and operating facilities, besides creating a connecting “hinge” between the various pavilions of the existing Policlinic.

The overall duration of the concession, which also includes the period necessary for the construction, is fixed at 20 years. CMB was assigned the civil works, systems and green areas, besides facility management services.

A tailored work

Thanks to BIM technology it was possible to adapt systems to new and old spaces.
At Verona, thanks to BIM, is was possible to evaluate the works necessary for developing the engineering heart of Borgo Roma hospital and the rainfall-discharge interferences of the entrance portico of Borgo Trento hospital and to adapt to the different types of floor in the structure.

> Read more

After the work, maintenance and services

After completion of the hospital, CMB looks after the maintenance and management of the services, because a work well done has to continue to operate efficiently over time. With a project financing contract lasting 20 years, including the construction period, CMB guarantees the Verona Health Authority an all-round service. The maintenance services include those for the civil works, the systems and the green areas. The services include catering for patients, the call centre, cleaning and laundering.

Value of the works
126,200,000 euros
Client
Azienda ospedaliera universitaria integrata di Verona
Role in the project
Project leader
Completion times
October 2014 – March 2017
see also

Niguarda Ca’ Granda Hospital Milan

2013

Altovicentino hospital Thiene (IT)

2011

Odense Hospital Complex Odense (Denmark)

 
Share this page
Share this page
Back to top
CMB Carpi Logo

P.IVA 00154410369
Registro delle Società di Modena
n. 00154410369 – C.C.I.A.A. 2698
Albo Cooperative n. A100255

©2018 CMB
Cooperativa Muratori e Braccianti di Carpi
Tutti i diritti riservati / All rights reserved

PROJECTS

FACILITY MANAGEMENT

PEOPLE

SAFETY

INNOVATION

COMPANY
What we do
Values
Enterprise’s History
Governance
Results
Commitment
Certifications
Becoming Supplier

LAVORA CON NOI

MEDIA
News
Video
House Organ
Press Release
Press Kit

SOCIAL NETWORK
Linkedin
Youtube

CONTACTS
Sede Centrale
via C. Marx 101 Carpi (MO) – ITALY
Ph +39 059 6322111
Fax +39 059 691079

Privacy Policy
Cookie Policy
Credits